Modular Screenless Time Scheduler 1-Channel Bluetooth
Modular Screenless Time Scheduler 1-Channel Bluetooth
Modular Screenless Time Scheduler 1-Channel Bluetooth
Modular Screenless Time Scheduler 1-Channel Bluetooth

Modular Screenless Time Scheduler 1-Channel Bluetooth

Available In stock 9 Items Reference DINUY IH DIN BW1
€169.15
VAT included

Notify me when in stock

Drop your email and we'll let you know the moment it's back.

  • Envío gratis Península desde 50€
  • Devoluciones
  • Pago seguro
  • Garantía
  • Power (W) 600
  • Protection IP20

Digital time switch without 1 channel display, DIN 35 mm format. Remote configuration via Bluetooth with DINOY app - Configure (iOS/Android). Output 1 x 16 A and up to 64 programmable maneuvers. Includes Zero Crossing technology for zero-pass switching.

Description

A channel's modular screenless scheduler is a digital device designed to automate electrical switching in residential and commercial facilities. It uses Bluetooth technology for remote configuration through mobile applications, allowing flexible management without the need for local visualization. This switch integrates perfectly into standard DIN rails, offering a compact and efficient solution for load control in various electrical environments.

Technical characteristics

  • Rail format DIN 35 mm
  • Output channel: 1 x 16 A
  • Maximum LED switching power: 600 W
  • Zero Crossing Technology Technology
  • Functions: ON/OFF/Impulse
  • Protection degree IP20
  • Dimensions: 17.5 mm x 90 mm x 53 mm
  • Bluetooth connection for external programming
  • Automatic activation summer/winter time
  • Holiday programme included

Thanks to its ability to program up to 64 maneuvers, this device allows accurate management of energy consumption. The zero-pass technology ensures a smooth ignition that protects connected equipment, while the PIN lock option ensures authorized use. Its modular design facilitates installation in existing electrical enclosures without occupying additional space.

The installation is easy by direct fixation to the standard DIN rail. It connects to the power grid and is configured via Bluetooth from a smartphone using the corresponding app. Maintenance is minimal, requiring only checking the status of contacts periodically. Its 10-year range ensures reliable operation without the need for external batteries, ideal for long-term automations.

Product Details

Dimensiones

Measures 1 x 16
High 1
Width 16
Weight (kg) 0.2

Iluminación

Power (W) 600

Protección

Protection IP20

Otras

EAN 8422447018363
Manufacturer DINUY
Reference DINUY IH DIN BW1

Información legal

Fabricante DINUY
Dirección Auzolan Kalea, 2, 20303 Irun, Gipuzkoa, ES
Email [email protected]
Teléfono +34 943627988
Referencia DINUY IH DIN BW1
EAN 8422447018363
9 Items
8422447018363
AME

Downloads

Reviews (0)

No reviews

12 other products in the same category:

Product added to wishlist
Product added to compare.